45 Lewes Road – Construction
Planning permission was Granted on 17th June 2019 for and following consultation with Building Control we have progressed swiftly into […]
Planning permission was Granted on 17th June 2019 for and following consultation with Building Control we have progressed swiftly into […]
And work starts on the rear and side extension. It’s all going as smoothly as planned. Having topped out the
How to keep dry as the roof is removed! The roof is taking shape! How to complacently redesign the roof
As work progresses enthusiasm changing from demolition to construction. Following a tentative start, the project is picking up steam. With
Passive design maximises the use of ‘natural’ sources of heating, cooling and ventilation to create comfortable conditions inside buildings. It harness environmental conditions such as solar radiation, cool night air and air
Ventilation is necessary in buildings to remove ‘stale’ air and replace it with ‘fresh’ air. This can be achieved through good design in
Introduction Robert Street Architects can assist with providing provisional guidance on thermal efficiencies and how these can be achieved most
Work is starting in the new year for the redevelopment of this 3 bed-roomed semi-detached house into a 4 bedroom
The Party Wall etc. Act 1996 is an enabling Act, insofar as it grants the owner of a property the legal right to undertake certain works that might