45 Lewes Road – Construction
- Construction
- 27/01/20
Planning permission was Granted on 17th June 2019 for and following consultation with Building Control we have progressed swiftly into construction.
Work is progressing on the construction of the ground floor extension at 45 Lewes Road. Uncovering unexpected tile flooring has required changes to the deign however these have been considered opportunities to improve the thermal efficiency of the extension.